Verandas in Ireland
A veranda is a roof against the house on posts at the front. The glass kind is put up by a crew for €1,300 to €2,200, and one seller prices a 4 × 3 m veranda with a polycarbonate roof from €3,230, supply only.
What a veranda is, what it is made of and what the glass kind costs.
Free, no obligation. One local fitter prices it, not five.
- from €3,230a 4 × 3 m veranda, polycarbonate roof
- €1,300–€2,200a crew for a glass one
- up to 10 yearsa guarantee in writing
- 30 m²of garden structures in all

What people mean by a veranda
In Ireland the word covers a roof on the back of a house over a patio, usually open at the sides and sometimes closed in with doors. It is not a conservatory, which is a room with its own walls. A veranda is a cover.
Glass roof
- Light
- Clear sky above
- Weight
- Heavy, so a stronger frame
- Cost to start
- Crew €1,300 to €2,200, kit from €2,050
Polycarbonate roof
- Light
- Soft light through sheet
- Weight
- About a quarter of glass in multiwall
- Cost to start
- From €3,230 for 4 × 3 m, supply only
Price your glass pergola
Four taps, and the price shows as you go. Your name and number come last, and only if you want a fitter to price it.
A glass veranda, about 4 × 3 m, fitted: From €2,050 for the kit, about €1,600 to fit.
How the price is worked out
The kit figure is where a glass-roof kit starts in Ireland now, supply only. Sellers list one range for every size, so a bigger one costs more, and a made-to-measure one is quoted separately. The fitting figure is what one seller charges its crew to put up a glass-roof veranda of that size within 100 km of its showroom. A base, electrics, lights and heaters are not in either, because they depend on your garden. Use it to plan with. It is not a quote: a fitter prices yours after seeing where it goes.
Which one to price first
If the patio is shaded by the house for much of the day, glass gives the most light. If it faces the sun, the glass itself matters, and sheet can be easier on the room behind. Heat and glare under glass and glass or polycarbonate go through the choice.
What a veranda is made of
- The frame. Aluminium, powder-coated, so it never needs painting.
- The roof. Laminated glass, or polycarbonate sheet.
- The gutter. Built into the frame in most kits, with the downpipe inside a post.
- The sides. Open, or closed in with screens or doors, each an extra.
What the planning rules say about one
A veranda is fixed to the house, so the garden-structure rule does not settle it. Class 3 lists tents, awnings, shades, greenhouses, garages, stores and sheds. A glass roof fixed to the house and closed in at the sides looks more like an extension, which falls under a different class with a 45 m² limit. Only the council can say which one applies, so ask it before you order. A section 5 declaration costs €80 and gets an answer in 4 weeks.
More to read on glass roofs
Glass verandasA sloping glass roof on a frame against the wall, and what a crew charges to put it up.
Lean-to glass patio roofsA glass roof over the patio you already have, falling away from the wall.
Glass or polycarbonateLight, noise, weight, cost and how long each lasts.
What a glass pergola costsEvery price on one page, with what is and is not in each.
Planning permissionThe four limits, and where a glass roof against the house changes them.
SizesFrom 2 m to 10 m wide, and how many square metres each takes.Before you order
How much does a veranda cost in Ireland?
One seller prices a 4 × 3 m veranda with a polycarbonate roof from €3,230, supply only, with VAT and delivery in the figure. A glass one is put up by a crew for €1,300 to €2,200.
What is the difference between a veranda and a conservatory?
A conservatory is a room with walls and a door to the house. A veranda is a roof on posts, open at the sides.
Does a veranda need planning permission?
Class 3 lists tents, awnings, shades, greenhouses, garages, stores and sheds. A glass roof fixed to the house and closed in at the sides looks more like an extension, which falls under a different class with a 45 m² limit. Only the council can say which one applies, so ask it before you order.
How long does it take to put up?
Expect 6 to 8 weeks between ordering a made-to-measure roof and the day it arrives. One seller says free delivery of its glass veranda can take up to 2 months. A glazed roof then keeps the crew for 2 to 4 days.
Every page on this site
Glass roofs
Costs, sizes and rules

See the price before you say a word
Tap what you are after and how big. If you then want a written price, one local fitter in your county rings to fix a time to see the garden.